Lynnwood Storage
Description: 140,000 sq ft, Lynnwood WA
5-level structural steel self-storage facility with composite floor decks and a special concentric braced frame lateral system.
Design Challenges: Close coordination with the Geotechnical consultant resulting in extensive foundation modifications to mitigate a large area of unsuitable fills encountered during construction.
Camp Lejeune BEQ
Description: 115,000 sq ft, USMC Camp Lejeune, Jacksonville NC
5-level enlisted housing facility with solid grouted CMU bearing walls and hollowcore precast plank floors.
Design Challenges: Anti-Terrorism Force Protection (ATFP) design criteria in addition to the International Building Code (IBC). Additional requirements for hurricane level winds.
Harborstone Credit Union Branch Office
Description: 20,000 sq ft, Hawk’s Prairie, WA
3-level Structural steel office building with composite floor decks and a special concentric braced frame lateral system.
Copyright © 2021 Solutions 4 Structures - All Rights Reserved.
Powered by GoDaddy